Key Facts

  • Client: Scottish Water
  • Engineer: Fairhurst
  • Conditions of contract: NEC3 Option A Lump Sum
  • Contract value: £289,000
  • Duration of works: Nov’12 – Aug’13

Download the case study

Reservoir Working

Earlsburn Reservoir Repairs

Earlsburn Reservoirs are situated in the hills above Stirling, accessed by a 3km long, single-track, hard-core road. The work at the upper reservoir comprised reducing the level of the spillway weir (and hence the impounded volume of water) which required reconstruction of the concrete overflow weir to a reduced O.D level. Works at the Lower Reservoir consisted of lowering the embankment at one end by 0.5m to create a secondary spill area, with a reinforcing geotextile incorporated within the reconstructed embankment. At the same time, the spillway channel and valve tower access bridges were replaced with new GRP structures.

Delivery and installation of the bridges utilised helicopter access but the remote location still presented challenging access conditions, particularly during the worst of the winter weather.

News updates

REPLACEMENT OF OBAN FERRY TERMINAL – LINKSPAN No1

The overall project involves the off-site fabrication and installation of a new linkspan structure at Oban Ferry Terminal for client Caledonian Maritime Assets Ltd (CMal).

12th February 2019

read more

GL return to the Sound of Kerrera

GL making a return visit to the Sound of Kerrera off Oban, to undertake substantial repairs to the breakwater which suffered collision damage following an altercation with a workboat earlier this year.

14th December 2018

read more

Polmadie Bridge official opening……..

Michael Matheson MSP and Cabinet Secretary for Transport, Infrastructure and Connectivity covered all his portfolios at the official opening of the new Polmadie Footbridge giving pedestrian and cycle transport access,

18th September 2018

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131