Key Facts

  • Client: Scottish Water
  • Engineer: AECOM
  • Conditions of contract: NEC3 Option A Lump Sum
  • Contract value: £115,000
  • Duration of works: Aug’11 to Jan’12

Download the case study

Reservoir Working

Drumbowie Reservoir Repairs

Drumbowie Reservoir is situated in the hills above Denny and although no longer supplying water into supply, still requires regular inspection and maintenance under the Reservoirs Act.
This work resulting from the annual inspection comprised vegetation clearance and both masonry and stone pitching repairs to both the reservoir embankment face and the 600m long overflow spillway channel. Drainage improvements on the embankment access road, and concrete and fencing repairs to the cattle drinking points on the inlet burn were also undertaken.

News updates

REPLACEMENT OF OBAN FERRY TERMINAL – LINKSPAN No1

The overall project involves the off-site fabrication and installation of a new linkspan structure at Oban Ferry Terminal for client Caledonian Maritime Assets Ltd (CMal).

12th February 2019

read more

GL return to the Sound of Kerrera

GL making a return visit to the Sound of Kerrera off Oban, to undertake substantial repairs to the breakwater which suffered collision damage following an altercation with a workboat earlier this year.

14th December 2018

read more

Polmadie Bridge official opening……..

Michael Matheson MSP and Cabinet Secretary for Transport, Infrastructure and Connectivity covered all his portfolios at the official opening of the new Polmadie Footbridge giving pedestrian and cycle transport access,

18th September 2018

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131