George Leslie Ltd
Menu

Montgarrie Bridge Reconstruction

Edinample Bridge, Locheanrhead

A816 Millbrae

A816 Millbrae

A861 Shiel Bridge – Acharacle Refurbishment of Foundations

Stobcross Footbridge Refurbishment

Parkhouse Road Bridge

Skeabost Bridge Refurbishment

Rest & Be Thankful Debris Slide Remediation

C502 Toll Bridge, Dunkeld

Temple Bridge Reconstruction

News updates

Piling work underway at McInroy’s Point for Western Ferries…..

Piling works are underway for the new secondary berth for Western Ferries at their McInroy’s Point terminal for the Gourock to Hunter’s Quay ferry following the demolition and removal of the old berthing structure. The new berthing structure has both 900mm diam & 600mm diam tubular piles secured with a combination of rock anchors and […]

7th September 2017

read more

GL Health & Safety Stand-Down Workshop – March 2017

A GL-wide stand-down was held on 24th March 2017, with all operational sites closed for the day to enable around 300 people to attend the Health & Safety Workshop at the Normandy Hotel.     GL was privileged to have Michael Martin, Project Director on the Queensferry Crossing, to start the day with a Keynote […]

12th April 2017

read more

Ripple Retreat Jetty, Loch Venachar

A Cost-plus contract is nice to have but sometimes a Cost-minus project can be equally rewarding!

31st March 2017

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131