Key Facts

  • Client: Western Ferries (Clyde) Limited
  • Engineer: Arch Henderson LLP
  • Conditions of contract: NEC Option B
  • Contract value: £1.6M
  • Duration of works: May 2017 to January 2018

Download the case study

Marine Works

McInroy’s Point Secondary Berth Reconstruction

This project was for the reconstruction of the secondary roll-on/roll-off berth for Wester Ferries’ busy Gourock to Dunoon car ferry service on the Firth of Clyde. The reconstructed facility complements the main berth which was constructed by George Leslie Ltd in 2007, and provides added resilience to this busy route to the Cowal peninsular.

The work involved dismantling and removing the existing link-span arrangement which included the extraction, removal and demolition of the existing steel and timber piles, steel bracing and H beams of the original berthing face.

New construction comprised reinforced concrete bank-seat and yoke dolphin both supported on raking tubular piles with rock anchors and a new mono-piled berthing face. The offshore work was undertaken by a barge-mounted 100t crawler crane supported by land-based 70t crane and large excavator which also carried out the landside bank-seat construction work. Pontoons were used to float out the old link-span and to install the new structure under rising and falling tidal conditions respectively.

Cathodic protection, handrailing, realignment of the marshalling area, pedestrian walkways and approach roads, a replacement bus shelter and compressor housing, together with new gates, fencing and signage completed the new works.

A close and cooperative working relationship with Wester Ferries operational personnel ensured the busy ferry schedule was maintained throughout the work without disruption.

News updates

GL return to the Sound of Kerrera

GL making a return visit to the Sound of Kerrera off Oban, to undertake substantial repairs to the breakwater which suffered collision damage following an altercation with a workboat earlier this year.

14th December 2018

read more

Polmadie Bridge official opening……..

Michael Matheson MSP and Cabinet Secretary for Transport, Infrastructure and Connectivity covered all his portfolios at the official opening of the new Polmadie Footbridge giving pedestrian and cycle transport access,

18th September 2018

read more

Our Nation’s Tap Water……

GL are ahead of the curve in their support for Scottish Water’s recently launched campaign to encourage people to use a refillable bottle to ‘top up from the tap’ with over 250 GL-branded reusable water bottles distributed across the sites over the past three weeks.

27th June 2018

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131