Key Facts

  • Client: Scottish Water Solutions 2
  • Engineer: Scottish Water
  • Conditions of contract: NEC Option A
  • Contract value: £252,000
  • Duration of works: November 2012 - March 2013

Download the case study

Reservoir Working

Loch Coulter Reservoir / Maintenance & Safety Works

Capital Maintenance & Improvement Works to Loch Coulter reservoir and both Longhill and the main reservoir draw-off valve towers with critical monitoring and control of the reservoir top water level required throughout to ensure safety of working operations.

  • Structural repairs to the valve towers
  • Maintenance work to the dam embankment & spillway
  • Replacement tower access bridges
  • Repairs & replacement of valve indicators, access ladders, platforms, support beams, valves, spindles & handrails
  • Access road upgrading

News updates

REPLACEMENT OF OBAN FERRY TERMINAL – LINKSPAN No1

The overall project involves the off-site fabrication and installation of a new linkspan structure at Oban Ferry Terminal for client Caledonian Maritime Assets Ltd (CMal).

12th February 2019

read more

GL return to the Sound of Kerrera

GL making a return visit to the Sound of Kerrera off Oban, to undertake substantial repairs to the breakwater which suffered collision damage following an altercation with a workboat earlier this year.

14th December 2018

read more

Polmadie Bridge official opening……..

Michael Matheson MSP and Cabinet Secretary for Transport, Infrastructure and Connectivity covered all his portfolios at the official opening of the new Polmadie Footbridge giving pedestrian and cycle transport access,

18th September 2018

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131