Key Facts

  • Client: Railtrack Scotland
  • Engineer: Bovis Construction
  • Duration of works: December 1997 – March

Download the case study

Railway Works

Greenock Station Improvements

This contract comprised the complete refurbishment of the existing station at Greenock.  Extensive demolition work was involved at the outset.  Two redundant footbridges were removed, the larger of which entailed the use of a 400 ton mobile crane during a 29 hour possession.  The demolition of all the other disused masonry railway buildings then followed.

Strengthening works were carried out to the existing retaining walls using a rock anchor system which avoided the use of a sheet piled anchor wall.  Construction of the new platform and car parking facilities then proceeded.  Out of gauge platform edging was removed and new platform oversail units were installed to suit current vertical and horizontal alignment of the track.

Passenger facilities were considerably upgraded.  The existing station offices were reconstructed using the traditional materials salvaged from the original, while additional modern waiting shelters were also provided.  Disabled access was provided by way of mobility ramps.  Considerable strengthening work was required to the south boundary masonry wall.

The works were completed to a tight schedule despite the fact that planning permission for the demolition works was only received part way through the pre-booked possessions.

News updates

GL return to the Sound of Kerrera

GL making a return visit to the Sound of Kerrera off Oban, to undertake substantial repairs to the breakwater which suffered collision damage following an altercation with a workboat earlier this year.

14th December 2018

read more

Polmadie Bridge official opening……..

Michael Matheson MSP and Cabinet Secretary for Transport, Infrastructure and Connectivity covered all his portfolios at the official opening of the new Polmadie Footbridge giving pedestrian and cycle transport access,

18th September 2018

read more

Our Nation’s Tap Water……

GL are ahead of the curve in their support for Scottish Water’s recently launched campaign to encourage people to use a refillable bottle to ‘top up from the tap’ with over 250 GL-branded reusable water bottles distributed across the sites over the past three weeks.

27th June 2018

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131