Key Facts

  • Client: Scottish Water
  • Engineer: AECOM
  • Conditions of contract: NEC3 Option C
  • Contract value: £330,662
  • Duration of works: Jan 2014 - April 2014

Download the case study

Water Treatment Works

Glendevon Raw Water Water System Repair Works

Glendevon Water Treatment Works provides the principal supply of treated water to the greater part of Fife. This project was for essential repairs and upgrades to the raw water feed from Glendevon Reservoir, high in the Ochil Hills, to Glendevon Water Treatment Works.

The main areas of work included repairs to five pipe-bridges, mains replacement and upgrading and stabilisation work to areas of slope slippage.

 

News updates

GL return to the Sound of Kerrera

GL making a return visit to the Sound of Kerrera off Oban, to undertake substantial repairs to the breakwater which suffered collision damage following an altercation with a workboat earlier this year.

14th December 2018

read more

Polmadie Bridge official opening……..

Michael Matheson MSP and Cabinet Secretary for Transport, Infrastructure and Connectivity covered all his portfolios at the official opening of the new Polmadie Footbridge giving pedestrian and cycle transport access,

18th September 2018

read more

Our Nation’s Tap Water……

GL are ahead of the curve in their support for Scottish Water’s recently launched campaign to encourage people to use a refillable bottle to ‘top up from the tap’ with over 250 GL-branded reusable water bottles distributed across the sites over the past three weeks.

27th June 2018

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131