George Leslie Ltd
Menu

Key Facts

  • Client: South Lanarkshire Council
  • Engineer: South Lanarkshire Council
  • Conditions of contract: NEC3
  • Contract value: £400,000
  • Duration of works: February – April 2010

Download the case study

Railway Works

Carluke Park and Ride

The site is to the south of the railway line at Carluke Station off Station Road, Carluke.

The works involved the construction of an access ramp and stairway with pre-cast retaining walls to allow access from the newly constructed park and ride facility at Carluke Railway Station.

The particular feature of the works is the contractor-designed retaining walls which are faced in attractive natural stone.

Associated works included access street-lighting, security close-circuit TV installation and steel pedestrian parapets.

News updates

GL return to the Sound of Kerrera

GL making a return visit to the Sound of Kerrera off Oban, to undertake substantial repairs to the breakwater which suffered collision damage following an altercation with a workboat earlier this year.

14th December 2018

read more

Polmadie Bridge official opening……..

Michael Matheson MSP and Cabinet Secretary for Transport, Infrastructure and Connectivity covered all his portfolios at the official opening of the new Polmadie Footbridge giving pedestrian and cycle transport access,

18th September 2018

read more

Our Nation’s Tap Water……

GL are ahead of the curve in their support for Scottish Water’s recently launched campaign to encourage people to use a refillable bottle to ‘top up from the tap’ with over 250 GL-branded reusable water bottles distributed across the sites over the past three weeks.

27th June 2018

read more

George Leslie Ltd, Blackbyres Road, Barrhead, Glasgow, G78 1DU  |  mail@georgeleslie.co.uk  |  +44 (0)141 881 9131