The contract was to provide a temporary solution to remove the weight restriction on this existing road bridge spanning the main railway line, to allow unrestricted, single-lane access controlled by traffic signals over the weak bridge.
The work involved a full road closure and the installation of temporary traffic diversions, whilst maintaining pedestrian access. Thereafter a ‘long-term’, temporary rollover bridge was installed by spanning the existing bridge.
The installation was carried out under a full railway ‘possession’ closure.

Key Facts
| Client: | North Lanarkshire Council |
| Engineer: | |
| Contract Value: | £198K |
| Duration of works: | March 2008 - April 2008 |